Corning Gilbert RF Connectors
- Manufacturing lead time: 26 weeks
Manufacturer
Corning Gilbert
Powell Material Number
1005646128
Product Category
RF Connectors
Factory Lead Time: 26 Weeks, MOQ: 25
G3PO Male Hermetic Shroud, Body option 05, Full Detent, tab length 0.030 in, Straight cut Male Full Detent Thread-in Shroud Straight Terminal Packaged individually in bags
*All prices shown are exclusive of VAT.
We know this page isn’t quite up to our usual standards yet — we’re still adding detailed technical information and images. If you need data or help selecting the right part, get in touch with us and we’ll gladly assist. Thanks for bearing with us while we improve this listing.